| Construction of S2 expressway from Konotopa interchange to Puławska interchange |
|
Supervision: Consortium ARCADIS Sp. z o.o. (lider) / Egis Poland Sp. z o.o. / Egis Route-Scetauroute S.A. Employer: General Directorate of National Roads and Motorways Project duration: 31.08.2012 Project description: The investment covers: "Construction of S-2 expressway from "Konotopa" interchange "Puławska" interchange of the length of about 15 km, including a 5-km long section of the expressway connecting “Lotnisko” interchange with “Międzynarodowy Port Lotniczy Okęcie" interchange and "Marynarska" interchange. Stage III: Southern Bypass of Warsaw S2 – section from “Konotopa" interchange (without the interchange) to "Lotnisko" interchange (without the interchange). The comprehensive scope of the investment requires also modernisation of a local road network and the existing infrastructure clashing with the designed road as well as construction of devices limiting negative impact of the road traffic on environment. General data - Stage III The task covers the route from „Konotopa” interchange (excluding the interchange) to „Lotnisko” interchange (excluding the interchange) from km 455+550 to km 466+684. Basic technical parameters:
|