Elaboration of design documentation for construction of northern bypass of Pszczyna town

Contractor: Consortium of Egis Poland Sp. z o.o. / Egis Route – Scetauroute S.A

Employer: Zarząd Dróg Wojewódzkich w Katowicach

Gross Contract value: PLN 1,577,676.39

Project description: The Project concerns the elaboration of design documentation for construction of the northern bypass of the Pszczyna town.

The said bypass will be the new alignment of the Voivodship road no. 935 between an interchange of the national road no. 1 to the Voivodship road no. 935 at the border with Suszec Commune, with the length of ca. 4.8 km. The project goals include the design of the road with engineering structures, CD roads as well as relocation of utilities. The road shall be of ‘G’ class (main road).

The scope of design works comprises:

  • road section with the length of 4.8 km
  • road interchange
  • two level crossings
  • grade separations
  • road viaduct
  • retention walls, road barriers and noise screens

Planned date of completion: 30 July 2010